CLC BLOCK PLANT

  • Manual or full automatic manufacturing facilities are available depending on the capacity of the facility.
  • Number of molds is determined based on the capacity of the facility.
  • Can also be fed from cement silo or big-bag / bag unit.
  • Colloidal mixer can be used for mixing cement and water based on production capacity.
  • If there is suitable fly ash, can be used with a different silo or manual feeding systems.
  • Beam type mold can be used in manual productions.
  • Different type of cutting units are available.
  • Since cutting units are used in automatic systems, production in molds is done in form of blocks.
  • As seperate weighers can be used for each material (Sand / Cement / Fly Ash / Water), the production mixer can also be used as a weigher.
  • There is no need to make steam drying for foam concrete block, can be used optionally if demanded.
  • Molds can be manufactured as stationary or moving on rail.
  • In manual manufacturing facilities molds are usually used as stationary.
  • In stationary facilities, either mono pump is used for filling the molds or foam concrete is carried to molds with mold transfer table.
  • Every material that goes into production is measured with very sensitive electronic loadcells.
  • Foam concrete that poured in the molds is removed on the following day.
  • In stock waiting time for blocks which are produced without making steam cure is 2 weeks before use.
  • Production can be made naturally or by adding crushed EPS (styrofoam). In this situation, lighter, more resistant product can be obtained which also has higher isolation coefficient.